Winding Shop
HV and LV coils are wound in-house on our own machines. Winding quality is what sets load loss and short-circuit withstand, so it is not a process we sub-contract.
- Max Unit Wound
- Up to 25 MVA

The works · GIDC Sachin
A BIS licence is granted against an audited process, not a purchase order. These are the shops that process runs through — and the reason core, winding, tanking and testing are not sub-contracted.
Manufacturing
Each of these covers a step the BIS licence audits. Keeping them together is what makes the certification defensible and the repair path short.

HV and LV coils are wound in-house on our own machines. Winding quality is what sets load loss and short-circuit withstand, so it is not a process we sub-contract.

Core laminations are cut and stacked to the design. Core geometry decides the no-load loss the transformer will carry every hour of its life.

Tanks, radiators and conservators are fabricated, welded, leak-tested and painted on site, then matched to the core and coil assembly they were designed around.

Core and coil assemblies are clamped, braced, tanked and filled with treated insulating oil, with the crane capacity to handle units through the full rating range.
Testing
Routine tests are what turn a specification into a verifiable claim. The certificate that ships with a unit is also the baseline every later maintenance reading gets compared against.
Quality control
Checks happen at hold points through the build, not only at the end. Once a core and coil assembly is tanked and filled, finding a fault costs a great deal more than preventing one.
Core laminations, conductor and insulating materials are checked against specification before they enter the shop.
Winding, stacking and assembly are checked at defined hold points rather than only at the end, so a fault is caught before it is buried inside a tank.
Every unit goes through the full routine test set before dispatch. No unit ships on a partial result.
Test certificates are issued with each transformer, giving the buyer the commissioning baseline that all later maintenance readings get compared against.
Tula Trans Electricals
Rating & Certification Plate

Enquiries
We are at Near Paliwal Square, GIDC, Sachin, Surat. For a first order, an hour on a supplier's shop floor tells you more than any brochure.